- Mailing Lists
- Contributors
- Re: Manufacturing advice needed - materials of measured units being consumed partially
Archives
- By thread 1419
-
By date
- August 2019 59
- September 2019 118
- October 2019 165
- November 2019 97
- December 2019 35
- January 2020 58
- February 2020 204
- March 2020 121
- April 2020 172
- May 2020 50
- June 2020 158
- July 2020 85
- August 2020 94
- September 2020 193
- October 2020 277
- November 2020 100
- December 2020 159
- January 2021 38
- February 2021 87
- March 2021 146
- April 2021 73
- May 2021 90
- June 2021 86
- July 2021 123
- August 2021 50
- September 2021 68
- October 2021 66
- November 2021 74
- December 2021 75
- January 2022 98
- February 2022 77
- March 2022 68
- April 2022 31
- May 2022 59
- June 2022 87
- July 2022 141
- August 2022 38
- September 2022 73
- October 2022 152
- November 2022 39
- December 2022 50
- January 2023 93
- February 2023 49
- March 2023 106
- April 2023 47
- May 2023 69
- June 2023 92
- July 2023 64
- August 2023 103
- September 2023 91
- October 2023 101
- November 2023 94
- December 2023 46
- January 2024 75
- February 2024 79
- March 2024 104
- April 2024 63
- May 2024 40
- June 2024 160
- July 2024 80
- August 2024 70
- September 2024 62
- October 2024 121
- November 2024 117
- December 2024 89
- January 2025 59
- February 2025 104
- March 2025 96
- April 2025 107
- May 2025 52
- June 2025 72
- July 2025 60
- August 2025 81
- September 2025 124
- October 2025 63
- November 2025 22
Contributors
Re: Manufacturing advice needed - materials of measured units being consumed partially
Re: Manufacturing advice needed - materials of measured units being consumed partially
Re: Manufacturing advice needed - materials of measured units being consumed partially
Hello, thank you for all the answers.I guess I have to test this thoroughly. My worry is generally this: let's say I have 2 lots/rolls each with 50m raw cable remaining. I need to produce 100m final cable. I think the system would consider I have enough of raw cable for this. Because that would work for certain scenarios. Imagine you need 100kg of something to prdouce something else. If you have 2 lots each with 50kg you're good to go - you just combine 50kg from each. Similarily if it was pieces. All these can be joined / added. I am talking about scenario where partial residual amounts cannot be added together to create a larger piece / amount. Hope I am making myself clear. Best regards Radovan On štvrtok 27. januára 2022 0:17:23 CET James Dominy wrote: > Hello Radovan, > I would track your rolls of cable using Lots, this way when the order calls > for 25, 50, or 100 m of cable if the lot does not have the qty needed to > produce the ethernet cable it will use the lot that has enough for the > finished product. On Wed, Jan 26, 2022 at 3:57 PM Radovan Skolnik < > radovan@skolnik.info [1] > wrote: Daniel, > thank you for answer. Yes it does make sense. But will it cover scenario > where I have let's say 2 rolls with 50m remaining on each and I want to > produce 100m final cable? Because in such case a completely new roll should > be ordered as I cannot join those 2 50m pieces together... So it comes to a > requirement here that you just do not track the total number of meters > remaining but you need to track each roll individually. Similar example > would be a woodmaker who needs certain sizes of wood for various products > (chair, table, ...) and he procures wood in 3m planks. What is your > opinion? Best regards > Radovan > > On streda 26. januára 2022 21:51:47 CET Daniel Reis wrote: > > I believe you need to use different Units of Measure (UoM). > > In this case, the "Cable" Product is purchased in "Rolls" and used > > in "Meters". > > The "Roll" UoM should be configured to convert to Meters at a rate > > of 1:1000. > > This way you track your cable stock in meters available, and you > > order to your supplier in rolls. > > Dos this make sense? > > Thanks > > Daniel > > > > On 26/01/22 20:37, Radovan Skolnik > > wrote: > > > > Hello, > > sorry for asking stupid questions here but I hope someone can provide some > > wisdom here that I am missing. Let's imagine this scenario: I produce > > Ethernet cables of various lengths - i.e. 25m, 50m, 75m, 100m, ... Each > > such final cable requires 2 connectors and that particular amount of "raw" > > cable. I can only buy raw cable in rolls of 1000m. So when I buy a new > > roll > > and produce one final 50m cable, 950m of raw cable remains. When I produce > > another of 100m length, 850m of raw cable remains. When my remaining raw > > cable on certain roll is 50m I cannot produce 100m final cable and need to > > order another raw cable roll. So the idea is tracking remaining quantity > > of > > somethings (products? lots? ...) that is bought at certain size and is > > being gradually consumed. There can of course be more of these (i.e. I > > have > > bought 3 rolls at the same time). Is there a way on how to model this? > > Manufacturing is not really my domain and looking through code of various > > modules I didn't find anything that would resemble such thing. Thank you > > very much. Best regards > > Radovan Skolnik > > > > > > _______________________________________________ > > Mailing-List: https://odoo-community.org/groups/contributors-15 [2] [1] > > Post to: mailto: contributors@odoo-community.org [3] [2] > > Unsubscribe: https://odoo-community.org/groups?unsubscribe [4] [3] > > > > > > > > -- > > DANIEL > > REIS* > > MANAGING DIRECTOR > > M:* > > +351 919 991 307 > > E:* > > dreis@OpenSourceIntegrators.com [4] > > A:* > > Avenida da República 3000, Estoril Office B, #34 > > > > > > None [5] None [6] None [7] > > > > > > _______________________________________________ > > Mailing-List: https://odoo-community.org/groups/contributors-15 [5] [8] > > Post to: mailto: contributors@odoo-community.org [6] > > Unsubscribe: https://odoo-community.org/groups?unsubscribe [7] [9] > > > > > > > > [1] https://odoo-community.org/groups/contributors-15 [8] > > [2] mailto: contributors@odoo-community.org [9] > > [3] https://odoo-community.org/groups?unsubscribe [10] > > [4] mailto: dreis@OpenSourceIntegrators.com [11] > > [5] https://www.magentointegrators.com/ [12] > > [6] https://www.hadoopintegrators.com/ [13] > > [7] https://www.usaodoo.com/ [14] > > [8] https://odoo-community.org/groups/contributors-15 [15] > > [9] https://odoo-community.org/groups?unsubscribe [16] > > _______________________________________________ > Mailing-List: https://odoo-community.org/groups/contributors-15 [17] > Post to: mailto: contributors@odoo-community.org [18] > Unsubscribe: https://odoo-community.org/groups?unsubscribe [19] > > -- > * James Dominy * > CEO > * Lunel, Inc * > Saratoga Springs, UT > 719-888-9582 > jamesdominy@lunelerp.com [20] > * www.lunel.co [21] > * > > _______________________________________________ > Mailing-List: https://odoo-community.org/groups/contributors-15 [22] > Post to: mailto:contributors@odoo-community.org > Unsubscribe: https://odoo-community.org/groups?unsubscribe [23] > > > > [1] mailto:radovan@skolnik.info > [2] https://odoo-community.org/groups/contributors-15 > [3] mailto:contributors@odoo-community.org > [4] https://odoo-community.org/groups?unsubscribe > [5] https://odoo-community.org/groups/contributors-15 > [6] mailto:contributors@odoo-community.org > [7] https://odoo-community.org/groups?unsubscribe > [8] https://odoo-community.org/groups/contributors-15 > [9] mailto:contributors@odoo-community.org > [10] https://odoo-community.org/groups?unsubscribe > [11] mailto:dreis@OpenSourceIntegrators.com > [12] https://www.magentointegrators.com/ > [13] https://www.hadoopintegrators.com/ > [14] https://www.usaodoo.com/ > [15] https://odoo-community.org/groups/contributors-15 > [16] https://odoo-community.org/groups?unsubscribe > [17] https://odoo-community.org/groups/contributors-15 > [18] mailto:contributors@odoo-community.org > [19] https://odoo-community.org/groups?unsubscribe > [20] mailto:james@lunelerp.com > [21] http://www.lunel.co > [22] https://odoo-community.org/groups/contributors-15 > [23] https://odoo-community.org/groups?unsubscribe
by Radovan Skolnik - 07:11 - 27 Jan 2022
Reference
-
Manufacturing advice needed - materials of measured units being consumed partially
Hello, sorry for asking stupid questions here but I hope someone can provide some wisdom here that I am missing. Let's imagine this scenario: I produce Ethernet cables of various lengths - i.e. 25m, 50m, 75m, 100m, ... Each such final cable requires 2 connectors and that particular amount of "raw" cable. I can only buy raw cable in rolls of 1000m. So when I buy a new roll and produce one final 50m cable, 950m of raw cable remains. When I produce another of 100m length, 850m of raw cable remains. When my remaining raw cable on certain roll is 50m I cannot produce 100m final cable and need to order another raw cable roll. So the idea is tracking remaining quantity of somethings (products? lots? ...) that is bought at certain size and is being gradually consumed. There can of course be more of these (i.e. I have bought 3 rolls at the same time). Is there a way on how to model this? Manufacturing is not really my domain and looking through code of various modules I didn't find anything that would resemble such thing. Thank you very much. Best regards Radovan Skolnik
by Radovan Skolnik - 09:36 - 26 Jan 2022